LOG 178
Split Route and Stability Log
The route the system confirmed, beside what the site did. Each line marked recorded or rebuilt.
SPOILER · This record gives away a key plot point of Book One, Chapter 3.
Compare the safe route the system expected with what the site does as the team enters. Which lines were recorded in real time?
SOURCENEURA's route assessment and the team's observationsCUSTODIANNEURA and the operatives' LensesSTANDINGCross-verified, parts reconstructedMISSINGThe cause of the site's behaviour. Lines marked reconstructed are the archive's, not the system's.
Retained
Route confirmed. North access tunnel remains structurally stable. Interior surveillance minimal. Estimated time to core is eighteen minutes.
You have thirty seconds before recursive collapse.
Recursive collapse initiating. Core destruction triggered failsafe. You have four minutes.
NEURA's route into Split, as given. Beside it the site as it behaved, the cold, the door that was too easy, the thirty seconds and the four minutes. The lines recorded live are marked. The lines the archive rebuilt afterward are marked too, which is the first time this archive says in public what it reconstructed.